Thread Index (Page 160 of 597)
[802SEC] please review the 802.18 Radio Regulatory Technical Advisory Group draft response to the FCC Notice of Inquiry GN Docket No. 17-183 Exploring Flexible Use in Mid-Band Spectrum Between 3.7 GHz and 24 GHz,
Paul Nikolich
Fri, 15 Sep 2017 16:29:00 -0400 (EDT)
[802SEC] EC email ballot results - IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Law, David
Fri, 15 Sep 2017 11:45:10 -0400 (EDT)
[802SEC] IEEE-SA Fellowship Program at IEEE 802 – Fellowship Program Participant Survey,
Jodi Haasz
Fri, 15 Sep 2017 08:57:02 -0400 (EDT)
[802SEC] 802-1117-November 2017 IEEE 802 Plenary Registration and Hotel Reservations Available Now,
Lisa Ronmark
Wed, 13 Sep 2017 20:20:20 -0400 (EDT)
[802SEC] Updated 802.11 WG tentative agenda,
Adrian Stephens
Mon, 11 Sep 2017 00:53:48 -0400 (EDT)
[802SEC] 802.11ax CSD approval,
Adrian Stephens
Sun, 10 Sep 2017 21:47:51 -0400 (EDT)
[802SEC] P802.21-2017/Cor1 Sponsor Ballot results,
Das, Subir
Sun, 10 Sep 2017 20:12:10 -0400 (EDT)
[802SEC] Result of sponsor recirculation ballot for P802.11aq,
Adrian Stephens
Sun, 10 Sep 2017 13:51:26 -0400 (EDT)
[802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Law, David
Fri, 8 Sep 2017 14:47:35 -0400 (EDT)
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Clint Chaplin
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Law, David
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
John D'Ambrosia
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Adrian Stephens
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Steve Shellhammer
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Jon Rosdahl
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Kennedy, Rich
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Das, Subir
- Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Pat Thaler
- Message not available
Re: [802SEC] +++ ECM (early close) +++ IEEE 802.3 Beyond 10 km Optical PHYs Study Group press release,
Bob Heile
[802SEC] Call for Comments: IEEE-SA Response to FCC NOI,
Paul Nikolich
Tue, 5 Sep 2017 13:28:01 -0400 (EDT)
[802SEC] Telecon to resolve comments on signs of dominance doc,
Adrian Stephens
Mon, 4 Sep 2017 10:50:19 -0400 (EDT)
[802SEC] July Plenary - Opening Meeting Minutes Updated,
John D'Ambrosia
Fri, 1 Sep 2017 23:30:10 -0400 (EDT)
[802SEC] IEEE P802.3cb/D3.1 2.5 Gb/s and 5 Gb/s Backplane Sponsor 1st recirculation ballot,
Law, David
Thu, 31 Aug 2017 13:11:48 -0400 (EDT)
[802SEC] P802.11ax PAR modification,
Adrian Stephens
Thu, 31 Aug 2017 12:58:17 -0400 (EDT)
[802SEC] Sponsor Ballot Recirculation Minimum TIme?,
John D'Ambrosia
Wed, 30 Aug 2017 12:12:16 -0400 (EDT)
Return to top of Page
To IEEE 802 Web Site
Mail converted by MHonArc