Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear all, Please find attached a liaison from ITU-R WP5D to external organizations regarding “Modelling and simulation of IMT networks for use in sharing and compatibility studies”. Also attached here
is the document referenced in the liaison. WP5D plans on finalizing their work on this topic at their next meeting, October 5 – 13, 2016, in Genève, CH, with a document submission deadline of 28 September 2016, 16:00 hours UTC. They
would like to have our comments, if any, on the “PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R M.[IMT.MODEL]”. If this PDNR is finalized at that meeting then it would likely be submitted to SG5 for approval during their meeting to be held November 21 – 22, 2016,
also in Genève. Glad to discuss. Best regards, Mike Michael Lynch IEEE Liaison to ITU-R |
Attachment:
LS_EOs_5D_234_temp_125R1.docx
Description: LS_EOs_5D_234_temp_125R1.docx
Attachment:
Attachment_4.6 to 5D_234.docx
Description: Attachment_4.6 to 5D_234.docx