Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC, The latest sponsor recirculation ballot for P802.11ai closed last week. Two comments were received, which were from an individual not in the ballot group. Notwithstanding that, the comments were considered and a disposition agreed that did not result in a change to the draft. The project ended up with 97% approval, 21% abstain and 84% return. The updated full report is here: From the LMSC OM, the conditions attached are (+commentary on the outcome): Conditions: a) Recirculation ballot is completed. Generally, the recirculation ballot and resolution should occur in accordance with the schedule presented at the time of conditional approval. b) After resolution of the recirculation ballot is completed, the approval percentage is at least 75% and there are no new valid DISAPPROVE votes. c) No technical changes, as determined by the WG Chair, were made as a result of the recirculation ballot. d) No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters. e) If the WG Chair determines that there is a new invalid DISAPPROVE comment or vote, the WG Chair shall promptly provide details to the Sponsor. f) The WG Chair shall immediately report the results of the ballot to the Sponsor including: the date the ballot closed, vote tally and comments associated with any remaining disapproves (valid and invalid), the WG responses and the rationale
for ruling any vote invalid. (No votes were ruled invalid. The report cited above contains the details required by this item.) The project meets the terms of the conditional approval, and sponsor ballot will be started. Best Regards, Adrian P STEPHENS Tel: +44 (1793) 404825 (office) ---------------------------------------------- |