Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC members, Please find attached a slide set in support of the agenda items I've requested for today. In support of the consent agenda items the Working Group votes were as follows. Best regards, David ----- 6.041 MI*: IEEE 802.3 Next Generation Enterprise Access BASE-T PHY Study Group (1st extension) Y: 56, N: 0, A: 2 6.042 MI*: IEEE 802.3 25GBASE-T Study Group (1st extension) Y: 64, N: 0, A: 0 7.031 II*: Liaison letter to ITU-T SG5: New Recommendations related to Ethernet port protection (Information item) Y: 112, N: 0, A: 9 7.032 II*: Liaison letter to ITU-T SG15: Access Network Transport (ANT) Standardization Work Plan Y: 112, N: 0, A: 9 7.033 II*: Liaison letter to ITU-T SG15: Optical Transport Networks and Technologies (OTNT) Standardization Work Plan Y: 112, N: 0, A: 9 7.036 II*: Liaison letter to ISO/IEC JTC1 SC25: Remote powering Y: 86, N: 0, A: 8 7.037 II*: Liaison letter to ISO/IEC JTC1 SC25: Copper qualification Y: 55, N: 0, A: 7 7.038 II*: Liaison letter to ITU-T SG15: Timestamping point for multilane Ethernet interfaces Y: 112, N: 0, A: 9 7.039 II*: Liaison letter to IEC SC48B: Modular connectors Y: 89, N: 0, A: 11 ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
802d3_0315_closing_EC.pdf
Description: 802d3_0315_closing_EC.pdf
Attachment:
IEEE_802.3bw_unresolved_negative_comments.pdf
Description: IEEE_802.3bw_unresolved_negative_comments.pdf
Attachment:
IEEE_802.3bx_unresolved_negative_comments.pdf
Description: IEEE_802.3bx_unresolved_negative_comments.pdf