Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
AllI have prepared a response to comments on the P&P we submitted for AudCom approval (posted on mentor as: https://mentor.ieee.org/802-ec/dcn/14/ec-14-0031-00-00EC-response-to-audcom-comments-on-p-p.doc)
The listed 3 unacceptable changes and 1 editorial change.The 3 changes that were marked unacceptable are in clauses that may be modified and the text is unchanged from our P&P which was approved by SASB on 05 December, 2012. My suggested response is that we do not make the changes requested and I have provided justification for why we want the text the way it is.
The 1 editorial changes (a mis-numbered subclause) will be fixed when the P&P is re-submitted.
Also, we approved a change that did not make it into the version that I submitted to AudCom. That change was to add "Members Emeritus are appointed by the Sponsor Chair and are confirmed by the Sponsor." I will add this in the P&P that is re-submitted.
I will be in Piscataway for the AudCom meeting, so I can present our position, if necessary.
I have attached AudCom's comments and my proposed response to this email.John and Jon: Please add a 5 minutes for me on the conference call to discuss this.
James Gilb ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
ec-14-0031-00-00EC-Response-to-pnp-checklist V3 C_LM.doc
Description: MS-Word document
Attachment:
pnp-checklist V3 C_LM.doc
Description: MS-Word document