Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear Colleagues, The response to the 802.11 comments is:
·
Comment: 5.2b – this section does not read correctly.
·
Response: You are correct – it should have been written as a complete sentence. Add to the scope: This standard also specifies minor extensions and editorial corrections to the Application Priority
TLV.
·
Comment: Are you changing the scope of the project as shown in both paragraphs in 5.2b?
·
Response: Yes we are changing the scope of the project. They changed the way the system generates a PAR modification. It used to show the old text on the left and the new text on the right with the
changes highlighted. Now it shows the new scope in plain text on the left and change marked on the right so the contents of both boxes is the same.
·
Comment: 8.1 -- PAR modification form requires a statement of what and why (rationalization) the PAR is being changed be included in 8.1. Please add.
·
Response: Thank you for pointing that out since the small text below the 8.1 box was missed in editing the PAR form. Add to 8.1: The updated form is at: http://ieee802.org/1/files/public/docs2014/cd-thaler-Qcd-PAR-mod-0314-v02.pdf Regards, Pat From: ***** IEEE 802 Executive Committee List ***** [mailto:STDS-802-SEC@ieee.org]
On Behalf Of Tony Jeffree EC Colleagues 802.1 will be requesting EC approval to forward a PAR modification for P802.1Qcd, to NesCom, as documented here: Regards, ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
|