Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC members, Please find attached a slide set and attached documents in support of the agenda items I've requested for today. In support of the IEEE 802.3 liaison letter information item, and the Study Group extension consent agenda items, the Working Group vote were as follows: Liaison reply to ISO/IEC JTC1/SC 25 WG3: Information from IEC/SC 46C relevant to IEEE P802.3bp Y: 89, N: 0, A: 0 IEEE 802.3 1-Pair Power over Data Lines (PoDL) Study Group (1st extension) Y: 78, N: 0, A: 0 Best regards, David Law ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
802d3_1113_closing_EC_v1p1.pdf
Description: 802d3_1113_closing_EC_v1p1.pdf
Attachment:
IEEE_802d3_to_ISOIEC_JTC1_SC25_WG3_1113.pdf
Description: IEEE_802d3_to_ISOIEC_JTC1_SC25_WG3_1113.pdf
Attachment:
NGEPON_icaid_form_v1_94.pdf
Description: NGEPON_icaid_form_v1_94.pdf