Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] IEEE 802.3 agenda items for closing EC meeting



Dear EC members,

Please find slides in support of the IEEE 802.3 agenda items for the closing EC meeting tomorrow. In respect to the 1st Study Group extension, the two interpretation response and the three liaison letters I have asked to have placed on the consent agenda, the Working Group votes for them were as follows:

100 Gb/s Backplane and Copper Study Group Study Group (1st extension)
Y: 47, N: 0, A: 0

IEEE 802.3 Interpretation 1-3/11 response
Y: 44, N: 0, A: 2

IEEE 802.3 Interpretation 2-3/11 response
Y: 43, N: 1, A: 4

Liaison letter to ITU-T Study Group 15 'Documents from IEEE P802.3bf'
Y: 49, N: 0, A: 0

Liaison letter to ITU-T Study Group 15 'Copper 10 Gbit/s PHY asymmetry'
Y: 49, N: 0, A: 0

Liaison letter to ITU-T Study Group 15 'Ethernet Bandwidth assessment'
Y: 42, N: 0, A: 0

Best regards,
  David Law

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.

Attachment: ITU_01_0311.pdf
Description: ITU_01_0311.pdf

Attachment: IEEE802d3d1_unsatisfied_comments.pdf
Description: IEEE802d3d1_unsatisfied_comments.pdf

Attachment: P802.3.1REV_PAR_r2.pdf
Description: P802.3.1REV_PAR_r2.pdf

Attachment: ITU_03_0311.pdf
Description: ITU_03_0311.pdf

Attachment: ITU_02_0311.pdf
Description: ITU_02_0311.pdf

Attachment: 802d3_0311_closing_EC.pdf
Description: 802d3_0311_closing_EC.pdf