Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Folks, Sorry to spring this at the last minute, but it should be obvious that our current P&P revision process is in conflict with requirements of the IEEE-SA Standards Board Operation Manual. While the SBOM takes precedence, we still should update our P&P to be consistent. The attached revision ballot is fairly short, and addresses this issue. It also leaves open the possibility of further improving our revision process based on interactions with AudCom, or other concerns from EC members. Let me know if you have any comments. Regards, Mat Matthew Sherman, Ph.D. Engineering Fellow BAE Systems - Network Systems (NS) Office: +1 973.633.6344 Cell: +1 973.229.9520 email: matthew.sherman@baesystems.com ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
802.0-P&P Revision Process_-_Proposed_LMSC_P&P_Revision_Ballot_070720_r0.pdf