Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Folks,
Attached please find an updated SOW for P&P support. The work being conducted currently does not really match the scope of the originally defined SOW, so amendment is required. The important thing to keep in mind is that the cost for the support is going DOWN! There are a couple of reasons for this that I will explain in the meeting. The key was to adjust the defined scope in the SOW so that it matches the work being conducted. There is also an ‘option’ SA wants us to consider. It is NOT included in the final current SOW. However I will take a staw poll as to whether we want to conduct this work. If we do, SA will provide a separate SOW for that work in July for us to consider.
Here is the new SOW (including the option) with markup so you can see the changes:
<<SOW-Rev2--D1_mjs_kk.doc>>
Here is a clean copy of the SOW (with option removed):
<<Final 0503 SOW for SA P&P Support.doc>>
Senior Member Technical Staff
BAE SYSTEMS, CNIR
Office: +1 973.633.6344
email: matthew.sherman@baesystems.com
---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Final 0503 SOW for SA P&P Support.doc