Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All,
As you may recall at it’s July closing, the 802 LMSC conditionally approved moving the latest P802.15.4 draft to RevCom – conditional upon the SA Ballot Recirc. #4 completing successfully. The following is a link to the minutes and actions taken by the WG15 CRG for the P802.15.4 draft at the conclusion of SA Ballot Recirc. #4 of P802.15.4:
https://mentor.ieee.org/802.15/dcn/24/15-24-0443-00-04me-802-15-tg4me-crg-minutes-aug-16-2024.docx
As a result of the successful outcome we have proceeded with requesting (in MyProject) to submit the draft to RevCom.
James, Christy,
Any approvals needed by you are greatly appreciated.
To unsubscribe from the STDS-802-SEC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-SEC&A=1