Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
hello all,
at
thursday’s weekly 802.18 teleconference we reviewed the FCC FNPRM on 6GHz that
has come out and the due date for comments was announced of 29june20.
this
is the next step in opening up the 6GHz band for unlicensed operation that we
have been discussing for about 2 years.
the last step was the initial Report & Order that the FCC approved
in April, now the FNPRM is seeking comments on more details, e.g. Very Low
Power, PSD limits on Low Power Indoor, standard power portables with Auto
Frequency coordination, higher power point to point, contention based protocol,
etc.
when
IEEE 802 worked on comments for the first NPRM in late 2018, there were
different views among the different working groups and to find something we
could comment on that IEEE 802 as a whole could agree on was in essence just
letting the FCC know about the different standards we have in the band and
about them.
at
this point there has not been any text for comment contributions and we would
need a complete draft done in the next 7-10 days, so at the teleconference it
was suggested for me to send this out to let all know and if anyone was able to
write up comments considering 802 as a while for consideration then we could review them at next week’s
.18 thursday’s teleconference.
the
FNPRM (with 31 seek comments):
https://mentor.ieee.org/802.18/dcn/20/18-20-0062-02-0000-fcc-r-o-fnprm-promoting-unlicensed-use-of-the-6ghz-band-et-18-295.docx
the
proceeding
https://www.fcc.gov/ecfs/search/filings?proceedings_name=18-295&sort=date_disseminated,DESC
thanks
jay holcomb
802.18
To unsubscribe from the STDS-802-SEC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-SEC&A=1