Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802SEC] +++ Early Close 10-day EC Motion+++ Approval of response to FCC on a 5GAA ex parte requesting the FCC to re-configure most all of the U-NII-4 band to cellular V2X, away from the DSRC (802.11p)



Jay

I vote approve.

James Gilb

On 5/31/19 12:47 PM, Jay Holcomb wrote:
Dear LMSC Members,



 From the email I sent on 17may, I would like to announce the start of an EC
ballot on a response to the FCC on 5GAA???s 05 April 2019 ex parte requesting
the FCC to re-configure the U-NII-4, 5.9 GHz band, for even more of the
band to C-V2X (cellular). This is a further reduction for DSRC from their
original request for waiver last November (we commented on).  The ex parte
would reduce DSRC (IEEE 802.11p) to only a single 10MHz channel.



Note: 5GAA also filed this ex parte under the original proceeding that lead
up to DSRC and all, docket ET 13-49 (U-NII) Devices in the 5 GHz Band.
This request came after the RR-TAG vote, though I would like to file the
same comments in that docket also.



Paul has delegated to me to conduct a LMSC Early Close 10-day electronic
ballot on the motion below to approve our 5GAA ex parte response to the
FCC.  This EC motion is per 802 OM 7.2 Procedure for communication with
government bodies.



*Motion:*  Move to approve the response to the FCC in
https://mentor.ieee.org/802.18/dcn/19/18-19-0064-03-0000-5gaa-ex-parte-05apr19-response-ieee-802-fcc-gn-18-357.docx
<https://urldefense.proofpoint.com/v2/url?u=https-3A__mentor.ieee.org_802.18_dcn_19_18-2D19-2D0064-2D03-2D0000-2D5gaa-2Dex-2Dparte-2D05apr19-2Dresponse-2Dieee-2D802-2Dfcc-2Dgn-2D18-2D357.docx&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=APCDHKrlFcUtJIHlJ9OffsG7kCjy4Xzc86KOFBcs_Qs&e=>
to
5GAA???s 05 April 2019 ex parte to the FCC. With the chair of 802.18 to have
editorial privileges and send to the FCC under GN 18-357 and ET 13-49.



Approved in the TAG:   9 / 0 / 1 to send to FCC



Mover:        Jay Holcomb

Seconder:     Dorothy Stanley



Start of ballot: 31 May 2019

Close of ballot: 10 June 2019







*Reference documents:*

5GAA???s original waiver request in November and our comments in January:

https://mentor.ieee.org/802.18/dcn/18/18-18-0152-01-0000-5gaa-waiver-to-allow-its-cellular-vehicle-to-everything-c-v2x.docx
<https://urldefense.proofpoint.com/v2/url?u=https-3A__mentor.ieee.org_802.18_dcn_18_18-2D18-2D0152-2D01-2D0000-2D5gaa-2Dwaiver-2Dto-2Dallow-2Dits-2Dcellular-2Dvehicle-2Dto-2Deverything-2Dc-2Dv2x.docx&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=C-ILtEWRBtZEkeMYXjt5WfmRD1wJl1gW7DscFDY0XDc&e=>


https://mentor.ieee.org/802.18/dcn/18/18-18-0159-08-0000-fcc-gn-18-357-5gaa-waiver-ieee-802-comments.pdf
<https://urldefense.proofpoint.com/v2/url?u=https-3A__mentor.ieee.org_802.18_dcn_18_18-2D18-2D0159-2D08-2D0000-2Dfcc-2Dgn-2D18-2D357-2D5gaa-2Dwaiver-2Dieee-2D802-2Dcomments.pdf&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=mrEffLgcR6sQrLAJKfVmRY5Tbx5z2laWjYdL83w8vHI&e=>



5GAA???s ex parte on 05april19:

https://mentor.ieee.org/802.18/dcn/19/18-19-0051-00-0000-5gaa-waiver-ex-parte-notice-4-5-19-fcc-gn-18-357.pdf
<https://urldefense.proofpoint.com/v2/url?u=https-3A__mentor.ieee.org_802.18_dcn_19_18-2D19-2D0051-2D00-2D0000-2D5gaa-2Dwaiver-2Dex-2Dparte-2Dnotice-2D4-2D5-2D19-2Dfcc-2Dgn-2D18-2D357.pdf&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=xaA3eyupW8BxU3c3P4WCPfJHmTwzlNWwBtWiHZI66DI&e=>



FCC proceeding sites overall:

1. 5GAA waiver: GN 18-357:

https://www.fcc.gov/ecfs/search/filings?proceedings_name=18-357&sort=date_disseminated,DESC
<https://urldefense.proofpoint.com/v2/url?u=https-3A__www.fcc.gov_ecfs_search_filings-3Fproceedings-5Fname-3D18-2D357-26sort-3Ddate-5Fdisseminated-2CDESC&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=lva5ishXBIQob_75J-lAY-GBHL_OO_kxoBjJ76JqGcE&e=>

2. Parent proceeding: ET 13-49:

https://www.fcc.gov/ecfs/search/filings?proceedings_name=13-49&sort=date_disseminated,DESC
<https://urldefense.proofpoint.com/v2/url?u=https-3A__www.fcc.gov_ecfs_search_filings-3Fproceedings-5Fname-3D13-2D49-26sort-3Ddate-5Fdisseminated-2CDESC&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=eXzLWnfHWrYwqFd3O8JjNrTodnVTxziaAH0RDrtNZKk&e=>



 From the FCC sites:

*5G Automotive Association*
<https://urldefense.proofpoint.com/v2/url?u=https-3A__www.fcc.gov_ecfs_filing_1040534706725&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=ecQNcyve19oj0C516oRKnW9Flc1b0dIuwKyowlWysrk&e=>

*5GAA Ex Parte Notice 4.5.19.pdf**  49Opens a New Window.*
<https://urldefense.proofpoint.com/v2/url?u=https-3A__ecfsapi.fcc.gov_file_1040534706725_5GAA-2520Ex-2520Parte-2520Notice-25204.5.19.pdf&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=qt6KWl157s-2w9NLC9WY1gmc2PcFLXt2uViB15jLumQ&e=>

GN 18-357

ET 13-49

Received:4/5/2019

Posted:4/8/19

*ex parte*

*NOTICE*



Early close: As required in subclause 4.1.2 'Voting rules' of the IEEE 802
LAN/MAN Standards Committee (LMSC) Operations Manual, this is notice that,
to ensure the release is provided in a timely manner, this ballot may close
early once sufficient responses are received to clearly decide a matter.
Sufficient responses to clearly decide this matter will be based on the
required majority for a motion under subclause 7.1.1 'Actions requiring
approval by a majority vote' item (h), 'Other motions brought to the floor
by members (when deemed in order by the Sponsor Chair)' of the IEEE 802
LAN/MAN Standards Committee (LMSC) Policies and Procedures.





Note2, as mentioned in email on 17th, the RR-TAG passed a second motion to
send the same comments to the US DoT, and logistics for that have taken
some time and are just now being finalized, why the delay to start
balloting. It was decided in this week's RR-TAG???s teleconference to start
the FCC ballot and will run the ballot for the DoT submission soon.  A
draft for that document: https://mentor.ieee.org/802.18/dcn/19/18-19-0069
<https://urldefense.proofpoint.com/v2/url?u=https-3A__mentor.ieee.org_802.18_dcn_19_18-2D19-2D0069-2D00-2D0000-2D5gaa-2Dex-2Dparte-2D05apr19-2Dresponse-2Dieee-2D802-2Dto-2Dus-2Ddot.docx&d=DwMFaQ&c=pqcuzKEN_84c78MOSc5_fw&r=z8R-nWJ8GIxwjOjNKhEFByb-tZ6XE3GZXWSggNdVo-w&m=Yd8y3ri7VVuQCahI-M0ipCM-Ak_nPEueH-y3bbUjmKU&s=kNFaqXBXAHIs9Q8BbWH3HRuPOfafK5K-UaxA0Ly1BQQ&e=>



Regards,

Jay Holcomb

Liberty Lake (Spokane), WA

Itron, Inc.

IEEE 802.18 Chair

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.


----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.