Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802SEC] +++10 day ECM+++ P802.11ak to RevCom (unconditional)



Adrian

I vote approve.

James Gilb

On 01/19/2018 12:49 PM, Adrian Stephens wrote:
Dear 802 EC members,

Paul has approved the following ballot.

Motion

======

Approve sending P802.11ak D6.0 to RevCom.
Approve the CSD (5C) in https://mentor.ieee.org/802.11/dcn/12/11-12-1208-00-0glk-802-11-glk-draft-5c.docx

Moved:  Adrian Stephens

Seconded:  Jon Rosdahl

Start of ballot: 2018-01-19

Close of ballot: 2018-01-29, 23:59 UTC-12


==================================

Supporting material

==================================


P802.11ak D6.0 had 96% approval at the end of the last sponsor recirculation ballot. Subsequently 4 (i.e., all) of the “no” voters changed their vote to “yes” resulting in an approval of 100%. See https://mentor.ieee.org/802.11/dcn/18/11-18-0045-03-00ak-p802-11ak-revcom-submittal.pptx for supporting documentation.


In the WG,  forwarding draft to RevCom (y/n/a): 51, 0, 0;
Reaffirmation of the CSD (5C) (y/n/a): 49, 0, 1.

Note 1: this project was originally approved under the 5C rules. Re-approval of the 5C is therefore not necessary,  but we have done it anyway to provide a data point for consistency with current practice.


Note 2: this project has been pre-submitted, with Paul's approval, to RevCom in order to meet the 26th January submission deadline for the March 2018 RevCom/Standards Board meetings.


----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.