Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.Dear EC,
In July, 802.11 approved a PAR modification to P802.11ax thus:
Believing that the PAR modification contained in the document referenced below meets IEEE-SA guidelines,
Request that the PAR modification contained in https://mentor.ieee.org/802.11/dcn/17/11-17-0913-02-00ax- be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to NesCom.par-modification-to-support-6- ghz-band.docx
Moved: Osama Aboul-Magd
Seconded: Peter Ecclesine
Result: 48-0-0 Passes
TGax result: Moved: Rich Kennedy, Seconded: Stephen Palm, Result: 54-0-0
The original PAR was approved in April 2014.
I believe that the original 5C in document: https://mentor.ieee.org/802.
11/dcn/13/11-13-1410-06-0hew- applies, as this predates the CSD requirements.802-11-hew-draft-par-and-5c. docx
I don't believe the 5C needs to be re-approved. If anybody can show that I'm wrong, please do so,
asap, as we have an interim coming up in a couple of weeks where this could be considered.
-- Sincerely, Adrian Stephens IEEE 802.11 Working Group Chair mailto: adrian.p.stephens@ieee.org Phone: +1 (971) 203-2032 Skype: adrian_stephens