Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] +++EC 5 Day Review+++ Liaison letter to ITU SG15 on IEEE P802.3ca Wavelength Plan



Dear EC members,

At the IEEE 802.3 January 2017 interim meeting this week the IEEE 802.3 Working Group approved sending a liaison letter to ITU-T SG15 in respect to the IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force Wavelength Plan. The motion passed Y: 56, N: 0, A: 1.

Based on the above I'm announcing the start of the five day review required by subclause 7.2.2 'Sponsor subgroup communications with government bodies' of the IEEE 802 LMSC Operations Manual for statements not presented for review in a sponsor meeting. The draft letter is attached and if there is no motion to block made before Wednesday 18th January 2017 23:59 AOE I will go ahead and send the letter.

Best regards,
  David

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.

Attachment: IEEE_802d3_to_ITUTSG15_0117_draft.pdf
Description: IEEE_802d3_to_ITUTSG15_0117_draft.pdf