Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] IEEE P 802.21: SB recirculation#3



Dear EC,

IEEE P 802.21, Sponsor Ballot Recirculation #3 has completed with the following result. Therefore, the EC conditional approval for

forwarding the draft to RevCom has been met. I will submit the draft before December deadline.

 

 

Regards,

_Subir

 

==================

Ballot Open Date: 08-Nov-2016

Ballot Close Date: 18-Nov-2016

Draft #: D07

Ballots Received: 1

 

RESPONSE RATE

This ballot has met the 75% returned ballot requirement.

 

59 eligible people in this ballot group.

 

54 affirmative votes

0 total negative votes with comments

0 negative votes with new comments

0 negative votes without comments

1 abstention votes: (Lack of time: 1)

 

 

 

55 votes received = 93% returned

1% abstention

 

APPROVAL RATE

The 75% affirmation requirement is being met.

54 affirmative votes

0  negative votes with comments

 

54 votes = 100% affirmative

---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.