Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC, IEEE P 802.21, Sponsor Ballot Recirculation #3 has completed with the following result. Therefore, the EC conditional approval for forwarding the draft to RevCom has been met. I will submit the draft before December deadline.
Regards, _Subir ================== Ballot Open Date: 08-Nov-2016 Ballot Close Date: 18-Nov-2016 Draft #: D07 Ballots Received: 1 RESPONSE RATE This ballot has met the 75% returned ballot requirement. 59 eligible people in this ballot group. 54 affirmative votes 0 total negative votes with comments 0 negative votes with new comments 0 negative votes without comments 1 abstention votes: (Lack of time: 1) 55 votes received = 93% returned 1% abstention APPROVAL RATE The 75% affirmation requirement is being met. 54 affirmative votes 0 negative votes with comments 54 votes = 100% affirmative |