Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] Clause 12 report for IEEE P802.3bz 2.5G/5GBASE-T to RevCom



Dear EC members,

At the July 2016 IEEE 802 Plenary meeting, conditional approval was granted to forward IEEE P802.3bz 2.5G/5GBASE-T to RevCom. Details are provided in the attached report, but in summary the response to the IEEE 802 LMSC Operations Manual Clause 12 'Procedure for conditional approval to forward a draft standard' items are as follows:

a) The recirculation balloting is complete. The
   third recirculation ballot occurred in
   accordance to the plan presented. The planned
   comment resolution meeting was cancelled as no
   comments were received.

b) The approval rate is 100%.

c) No technical changes have been made.

d) There are no new valid DISAPPROVE votes or
   comments on new issues.

e) There are no new invalid DISAPPROVE votes
   which require details to the Sponsor.

f) Please see the attached for the date the ballot
   closed and the vote tally. 

Based on the above IEEE P802.3bz will remain on the September 2016 RevCom agenda.

Best regards,
  David

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.

Attachment: IEEE802d3bz_clause_12_report.pdf
Description: IEEE802d3bz_clause_12_report.pdf