Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi all--
Attached is the 802.15 motion package for the closing EC meeting coveringWorking Group votes are still needed for 3e and 4u. This will be updated to include those after the closing 802.15 plenary this evening.
- 802.15.3e to Sponsor Ballot (unconditional)
- 802.15.4t to Sponsor Ballot (conditional)
- 802.15.4u to RevCom (conditional)
- 802.15.7 PAR Title Change request to NesCom
- 802.15.8 PAR Extension request to NesCom
Comments and questions welcome.
Regards
Bob
Bob Heile, Ph.D
Director of Standards, Wi-SUN Alliance
Chair, IEEE 802.15 Working Group on Wireless Specialty Networks
Chair IEEE 2030.5 Working Group for Smart Energy Profile 2
Co-Chair IEEE P2030 Task Force 3 on Smartgrid Communications
11 Robert Toner Blvd, Suite 5-301
North Attleboro, MA 02763 USA
Mobile: +1-781-929-4832
email: bheile@ieee.org
Attachment:
15-16-0544-01-0000-802.15 July 29 EC Package.pptx
Description: Binary data