[802SEC] IEEE P802.3ca draft PAR and CSD response - Next Generation Ethernet Passive Optical Network (NG-EPON)
Dear EC members,
In support of subclause 10.2 'IEEE 802 LMSC Approval' of the LMSC Operations Manual please find below the required information in respect to the IEEE P802.3ca Standard for Ethernet Amendment: Physical Layer Specifications and Management Parameters for 25 Gb/s and 100 Gb/s Passive Optical Networks PAR for consideration at the November 2015 plenary.
Best regards,
David
[1] Draft PAR and CSD responses:
Draft PAR: <http://ieee802.org/3/NGEPONSG/documents/P802_3ca_PAR_290915.pdf>
CSD responses: <http://ieee802.org/3/NGEPONSG/documents/100gepon_CSD.pdf>
[2] Explanatory technical background material:
The project is applicable to business and residential access environments. The project is needed to enable access network operators to provide advanced bandwidth-intensive services while reducing footprint of network equipment, simplifying service upgrades, reducing network upgrade cost, and reducing fiber deployment costs.
[3] Status of the development of the PAR:
The draft PAR and CSD responses are pending IEEE 802.3 Working Group approval at the November 2015 plenary.
Since the submission deadline for the 4th December 2015 NesCom meeting (16th October 2015) occurs prior to the date of the November IEEE 802 EC meeting, I have pre-submitted this draft PAR to NesCom on the understanding that:
[a] Any changes to the draft PAR text resulting from the Plenary will be promptly communicated to the NesCom Administrator.
[b] Should the IEEE 802.3 Working Group not approve the submission, it will be removed from the IEEE 802 LMSC Executive Committee and NesCom agenda.
[c] Should the IEEE 802 LMSC Executive Committee not approve the submission, it will be removed from the NesCom agenda.
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.