Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC members, At the March 2015 IEEE 802 Plenary meeting, conditional approval was granted to forward IEEE P802.3bw 100BASE-T1 to Sponsor ballot. Details are provided in the attached report, but in summary the response to the IEEE 802 LMSC Operations Manual Clause 12 'Procedure for conditional approval to forward a draft standard' items are as follows: a) The recirculation balloting is complete. The second recirculation ballot occurred essentially in accordance of the plan presented. b) The approval rate is 97% and there were no new negative DISAPPROVES votes. c) No technical changes have been made. d) There were no new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing disapprove voters. e) There were two disapprove comments received from existing disapprove voters, one was a restatement of an existing unresolved comment, the second was out of scope as it was on unchanged text. f) Please see the attached for the date the ballot closed and the vote tally. In respect to comments associated with the remaining disapprove votes there are a total of 9 unresolved negative comments from 3 disapprove voters. This consists of 7 unresolved comments reported during the March 2015 closing IEEE 802 EC meeting and the two additional unresolved comments described in item (d). Based on the above I will go ahead and submit IEEE P802.3bw to Sponsor ballot. Best regards, David ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
IEEE802d3bw_clause_12_report.pdf
Description: IEEE802d3bw_clause_12_report.pdf