Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] Proposed Maintenance PAR: P802.1Q/Cor 1 - Bridges and Bridged Networks- Corrigendum 1: Technical and editorial corrections



Folks,
 
The proposed PAR for a corrigendum of P802.1Q is posted at:
 

http://www.ieee802.org/1/files/public/docs2014/new-p802-1Q-2014-cor-1-par-1114.pdf

 
This is a maintenance PAR - i.e., no CSD requirement and pre-circulate up to 48 hours before the closing EC.
 
This is for consideration at the Friday EC.
 
Cheers,

Glenn.

 

 

--

Glenn Parsons - Chair, IEEE 802.1

glenn.parsons@ericsson.com

+1-613-963-8141

 

---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.