Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Apurva, Only 1st Extensions on SGs have been placed on consent agenda. John From: owner-stds-802-sec@ieee.org [mailto:owner-stds-802-sec@ieee.org] On Behalf Of Mody, Apurva (US SSA) John, I would like to place additional item on the consent agenda if possible, in addition to the three items listed below. 4. Second Extension for the 802.22 Spectrum Occupancy Sensing Study Group. So, altogether, the 802.22 WG will have four items on the EC agenda tomorrow. Thanks Apurva From: Mody, Apurva (US SSA) John, 802.22 WG will have three items for the EC Closing Agenda 1. P802.22.3 PAR Approval – Spectrum Characterization and Occupancy Sensing (SCOS) 2. Approval of the Liaison Document to ISO/JTC1 on Responses to the SC6 NB comments under the 60 days ballot of the IEEE Std. 802.22-2011: 3. Approval of the Liaison Document to ISO/JTC1 to allocate IEEE 802.22 maintenance responsibility for the ISO/IEC/IEEE 8802-22 family of standards Thanks Mody From: owner-stds-802-sec@IEEE.ORG [mailto:owner-stds-802-sec@IEEE.ORG] On Behalf Of John_DAmbrosia@dell.com All – Reminder to send me any items for the agenda, as well as meeting materials for the closing meeting. Regards, John D’Ambrosia Chair, IEEE P802.3bs 400GbE Task Force ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv. ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv. ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv. |