Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] Proposed Maintenance PAR: P802.1AS/Cor2 -Timing and Synchronization for Time-Sensitive Applications in Bridged Local - Corrigendum 2



Folks,
 
The proposed PAR for a corrigendum of P802.1AS is posted at:
 
http://www.ieee802.org/1/files/public/docs2014/new-802-1AS-2011-Cor-2-draft-par-0514-v1.pdf
 
This is a maintenance PAR - i.e., no CSD requirement and pre-circulate up to 48 hours before the closing EC.
 
This is for consideration at the Friday EC.
 
Cheers,

Glenn.

---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.