Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Regarding my action item: It is very convenient to be able to go to one web page for documents like this as we do for IEEE 802 Policies and Procedure Documents or PARs under consideration. Therefore, I propose that we add a web page for CSDs of approved projects. When a PAR is approved or a modification to a CSD for an already approved PAR is approved, the CSD is added to the page. The PAR designation (e.g. IEEE 802.3bp), PAR title and CSD link would be listed for each CSD.
The page could be organized either 1.
Chronologically by approval date – similar to the PARs for consideration page – acceptable and easy to maintain, or 2.
With sections for active projects and archived (either completed or withdrawn) projects in project number order (nice – easy to find the docs for active projects in a particular dot, but more work). Regards, Pat From: ***** IEEE 802 Executive Committee List ***** [mailto:STDS-802-SEC@ieee.org]
On Behalf Of John D'Ambrosia For today’s call – here are the action items from March. John March Closing Plenary –
Action Item: 3.001 Marks Marks to provide 802.16 report to the EC with detailed schedule for each of the projects, which shall
be posted 1 week prior to the July 2014 Opening EC Meeting.
Action Item: 3.001 Thompson Thompson to supply draft language for a rules change regarding criteria for the confirmation of market relevance
and vitality of WGs, their projects, potential re-assignment of projects and hibernation
Action Item: 3.1 Gilb / D’Ambrosia Review rules for affiliation / endorsement letters.
Action Item: 3.1 Gilb Review rules regarding endorsement / affiliation letter requirements for temporary appointments.
Action Item 4.03 Thaler Develop a process to capture EC approved CSDs and make publicly available for easy review ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
|