Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] Clause 12 report for IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables to Sponsor ballot



Dear EC members,

At the March 2014 IEEE 802 Plenary meeting, conditional approval was granted to forward IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables to Sponsor ballot. Details are provided in the attached report, but in summary the response to the IEEE 802 LMSC Operations Manual Clause 12 'Procedure for conditional approval to forward a draft standard' items are as follows:

a) The recirculation balloting is complete. The
   second recirculation ballot occurred essentially
   in accordance of the plan presented.

b) The approval rate after resolution of the recirculation
   ballot is greater than 75% and there are no disapprove
   votes. 

c) No technical changes have been made.

d) There are no disapprove votes.

e) There are no disapprove votes.

f) Please see attached for the date the ballot closed and the vote
   tally. The IEEE P802.3bm comment resolution meeting took place
   last week and as a result of that meeting the one comment
   submitted was withdrawn and the one remaining disapprove balloter
   flipped his ballot to approve with comment. As a result of this
   I'm reporting that the approval rate after resolution of the
   recirculation ballot is 100%.

Based on the above I will go ahead and submit IEEE P802.3bm to sponsor ballot.

Best regards,
  David

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.

Attachment: IEEE802d3bm_clause_12_report.pdf
Description: IEEE802d3bm_clause_12_report.pdf