Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC members, At the March 2014 IEEE 802 Plenary meeting, conditional approval was granted to forward IEEE P802.3bj 100 Gb/s Backplane and Copper Cable to RevCom. Details are provided in the attached report, but in summary the response to the IEEE 802 LMSC Operations Manual Clause 12 'Procedure for conditional approval to forward a draft standard' items are as follows: a) The recirculation balloting is complete. The second recirculation ballot occurred essentially in accordance of the plan presented. b) The approval rate is 98% and there were no new negative DISAPPROVES votes c) No technical changes have been made. d) There were no new valid DISAPPROVE comments. e) There were no new invalid DISAPPROVE comments. f) Please see the attached for the date the ballot closed and the vote tally. In respect to comments associated with any remaining disapproves, there are no unresolved negative comments, the one remaining disapprove voter has no comments marked as required (Must Be Satisfied (MBS) in the myBallot system). Based on the above I will go ahead and submit IEEE P802.3bj to RevCom for consideration at their June 10th 2014 meeting. Best regards, David ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
IEEE802d3bj_clause_12_report.pdf
Description: IEEE802d3bj_clause_12_report.pdf