Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Ballot results for 802 O&A second recirculation



IEEE 802 Architecture list, hosted by 802.1:
 See www.ieee802.org/1/email-pages/ecdj1113.html
   or email hdk.1-hxddte0@hjkeen.net for help.
 Archive: www.ieee802.org/1/private/emaila/
-----

All

The results of the second recirculation of the 802 Overview & Architecture sponsor ballot is as follows:

Ballot Open Date: 	27-Feb-2014
Ballot Close Date: 	14-Mar-2014
Ballots Received: 	1
Comments: 	41
Must Be Satisfied Comments: 	40

RESPONSE RATE
This ballot has met the 75% returned ballot requirement.
174 eligible people in this ballot group.

145 	affirmative votes
6 	negative votes with comments
0 	negative votes without comments
7 	abstention votes: (Lack of expertise: 3, Lack of time: 4)
158 	votes received = 90% returned
  	                   4% abstention

APPROVAL RATE
The 75% affirmation requirement is being met.
145 	affirmative votes
6 	negative votes with comments
151 	votes = 96% affirmative

The comments have been uploaded to mentor at:
https://mentor.ieee.org/802-ec/dcn/14/ec-14-0019-00-00EC-802-sb3-comments.ods

James Gilb

===
Unsubscribe link: mailto:STDS-802-ARCH-SIGNOFF-REQUEST@LISTSERV.IEEE.ORG
IEEE. Fostering technological innovation and excellence for the benefit of humanity.