[802SEC] New and improved CSD/5C!
All
In our closing meeting in November, we approved changes to the
operations manual that changed many things with respect to the 5C.
These changes took effect at the end of the plenary session and hence
are the rules that we will use in March.
Some of the bigger changes are:
1. Project fill out a Criteria for Standards Development (CSD)
statement that includes project process requirements and the 5C
2. WGs and the Sponsor need to review and approve the CSD when:
a. Forwarding the PAR to NesCom
b. As part of the WG ballot to assure the draft is consistent with
the 5C
c. Forwarding the draft to Sponsor ballot
d. Forwarding the draft to RevCom
3. The CSD requirements remain the same throughout the life of a project
I have posted .doc and .odt format versions of the CSD copied from the
OM at:
http://www.ieee802.org/misc-docs/IEEE_802_CSD_v13.odt
http://www.ieee802.org/misc-docs/IEEE_802_CSD_v13.doc
James Gilb
IEEE 802 Second Vice Chair
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.