Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
FYI, This is a followup on the FCC 3.5 Ghz NPRM, https://mentor.ieee.org/802.18/dcn/12/18-12-0131-00-0000-fcc-3-5-ghz-nprm.docx, IEEE 802 provided comments in 2013 in document https://mentor.ieee.org/802.18/dcn/13/18-13-0004-11-0000-draft-802-comments-fcc-3550-3650-nprm.doc. The relevant proceeding details are here: COMMISSION SEEKS COMMENT ON LICENSING MODELS
AND TECHNICAL REQUIREMENTS IN THE 3550-3650 MHz BAND GN
Docket No. 12-354 Comment Date: December 5, 2013 Reply Comment Date: December 20, 2013 If we want to respond to this, it needs to happen at the November Plenary in Dallas. Released: 11/01/2013. COMMISSION SEEKS COMMENT ON LICENSING MODELS AND TECHNICAL REQUIREMENTS IN THE 3550-3650 MHZ BAND. (Dkt No 12-354 ). Comments Due: 12/05/2013. Reply Comments Due: 12/20/2013. (FCC No. 13-144). WTB . Contact: Paul Powell at (202) 418-1613; email: Paul.Powell@fcc.gov. Action by: the Commissionhttp://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-13-144A1.docx John John Notor President/Chief Technologist Notor Research Mobile: 1.408.799.2738 Skype: 1.408.457.1814 |