EC Colleauges -
I expect that I will be requesting permission in March to forward the P802.1Qcb draft PAR to NesCom, and am therefore precirculating the draft PAR and 5C to the EC as per current P&P. I have placed the draft PAR and 5C here:
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.