Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] Follow-up on changes suggested for 5C --



Hello
I submitted a proposed change to the 5C from 802.11 last Tuesday, and have not had any feedback on the change suggestion.
Based on the proposed 5C changes in 802 EC-12/56r2
https://mentor.ieee.org/802-ec/dcn/12/ec-12-0056-02-00EC-proposed-5c.pdf
I have noted the proposed change here:
 1.5 Economic Feasibility
  replace the 2nd sentence with ?The proposed project shall provide a summary of the ?cost for performance? analysis, showing the assessment factors including, at a minimum, the affect of installation costs.
Remove a), b) and c)
 
Rationale: State the metrics, then use them in assessments (in b)  with a single question and allow WG to provide assessments.)
The current statement of Economic Feasibility lends itself to a desire to write 3 separate paragraphs.  Clarifying and consolidating the statement would make the response more informative.
 
Comments? Thoughts?
Jon

-------------------------------------------------------------------------------
Jon Rosdahl                          10871 North 5750 West
hm:801-756-1496                   Highland, UT 84003
cell:801-376-6435
office: 801-492-4023
 
A Job is only necessary to eat!
A Family is necessary to be happy!!
---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.