Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear Executive Committee; The Next Generation 40 Gb/s and 100 Gb/s Optical Ethernet Study Group wishes to express our appreciation for the feedback you provided our body with regard to the PAR and 5C documents. Please accept the amended documents (attached) for consideration. We intend to request approval by 802.3 of these documents on Thursday. •The
5C
that was used is not the currently approved set of 5Cs that
are required by
802 EC OM (see 11.5.2).
Accepted. Please see the attached 5C document. PG6, and all questions updated per latest 802 EC OM requirements. •The
title
of the PAR and the 5C is different… The 5C document does not
reference
the PAR. Some note to tie the two together should be made.
Accepted. Please see the attached 5C document. PG4 •In
response
to page 11 of the 5C document:
Thank you again. :) ;) --
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Dan Dove Chair, Next Generation 40 Gb/s and 100 Gb/s Optical Ethernet Study Group |
Attachment:
dove_02_0712_optx.pdf
Description: Adobe PDF document
Attachment:
P802_3bm_PAR_Detail.pdf
Description: Adobe PDF document