Salutations!
I vote Abstain
I have now received the following responses:
Approve:
1. Tony Jeffree
2. John
D'Ambrosia
3. Michael Lynch
4. Apurva Mody
5. Steve
Shellhammer
6. Roger Marks
7. Clint Chaplin
8. Subir Das
9. Bruce Kraemer
Disapprove:
None
Abstain:
Jon Rosdahl
As 9 votes in favor constitutes greater than
50% of the voting population of the EC, the ballot is now terminated and the
motion passes.
Thanks to all for your support.
Regards,
Jon
IEEE 802 EC Exec Secretary
----- Original Message -----
Sent: Friday, June 15, 2012 9:27 AM
Subject: +++10 Day EC Email
Ballot+++Geneva Site Visit Authorization
Greetings:
Paul as authorized me to conduct a 10-Day e-mail
ballot on the following motion
This will be a 10-day ballot, closing on 25 June 2012 AOE;
as per current P&P I will terminate
the ballot early if it is clear that the outcome has been
decided.
Thank you for your
support
Jon
=======================================================================================
========================================================================================
Background:
This motion was on the agenda (9.01
in the Friday Plenary meeting) in Waikoloa, but fell off the
agenda.
From slide 15
--https://mentor.ieee.org/802-ec/dcn/12/ec-12-0007-03-00EC-executive-secretary-agenda-items-march-2012.ppt
•IEEE 802 July 2013 Plenary Session – Geneva, Switzerland •Why
Face To Face Events should conduct a site inspection to Geneva? •A
properly conducted site inspection is a significant factor in ensuring a
successful session. In particular when planning an event in a venue and
location not previously used by the IEEE 802, the site inspection will
accurately highlight both the positive and the negative aspects of a selected
location that cannot be quantified by reviewing a facility's sales literature
or meeting contracts alone. •Traveling to Geneva and meeting with the
local ITU/CCIG/CCV representatives, will provide Face to Face Events the
opportunity to evaluate all of the ITU/CICG/CCV facilities and services. The
site inspection would include all the meeting space, meeting room layouts,
network capabilities, AV/power requirements, F&B specifications, security,
staffing( including special name badges coordination) , shipment arrangements
and any other session considerations, including pricing and billing
procedures. •By conducting meetings with facility representatives face to
face we will be able to develop relationships that will be beneficial during
final contract negotiations and onsite logistics as well as pinpoint potential
problems and resolve them well ahead of the session, saving time and
money. •Our site inspection experience and expertise act as invaluable tool
in planning all aspects of the July 2013 IEEE 802 Plenary Session, we
appreciate your keen consideration of this
matter.
------------------------------------------------------------------------------- Jon
Rosdahl
10871 North 5750
West hm:801-756-1496
Highland, UT 84003 cell:801-376-6435 office: 801-492-4023 A
Job is only necessary to eat! A Family is necessary to be
happy!!
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
|