Geoff,
Jon covered the purpose of the site inspection in slides 15 and 16 of the
slide set. See his link.
Pat
P.S. It is just 802.3 for the September Geneva interim. Making it joint
was investigated but ITU didn't have enough meeting room space available
for those dates to add 802.1.
-----Original Message-----
From: ***** IEEE 802 Executive Committee List *****
[mailto:STDS-802-SEC@ieee.org] On Behalf Of Geoff Thompson
Sent: Thursday, March 22, 2012 11:07 AM
To: STDS-802-SEC@LISTSERV.IEEE.ORG
Subject: Re: [802SEC] Updated File for Exec Sec Agenda Items posted.
Jon-
I'm interested in the specifics of what is to be accomplished during a
site visit.
(Not doubting that it is needed. Just the specific goals and who)
I'm wondering if we can get some cost savings on the site visit from
combining the site visit with either the 802.1/3 September interim there
or any of the run-up activity for that.
Your thoughts please.
Best regards,
Geoff
On 163//12 8:55 PM, Jon Rosdahl wrote:
I will conduct an EC letter ballot later to ask for permission for a
Geneva Site Visit.
Thanks,
Jon
----------
This email is sent from the 802 Executive Committee email reflector. This
list is maintained by Listserv.
----------
This email is sent from the 802 Executive Committee email reflector. This
list is maintained by Listserv.