Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802SEC] Closing minutes posted, get those closing reports in.



James,
Thank you very much.

-Subir

On 11/14/2011 10:40 AM, James P. K. Gilb wrote:
Subir

It is my recollection that those things were said, I just didn't capture them. I will add that to the minutes and post a revision a little later (to allow for other corrections).

I have attached what the page will look like for everyone's review.

James Gilb

On 11/13/2011 06:51 PM, Subir Das wrote:
James,
I would like to bring your attention the following meeting notes:
4.01 ME 802.15.9 recommended practice for Key Management, PAR forward
to NesCom

Current it says:
"Das asked about the list of standards with similar scopes was limited
to IEEE or all groups.
Thaler said that it was all groups.
Das said what was the problem with adding the other groups.
Moskowitz said that it was his understanding that it was 802 only."

I captured the additional discussion which I believe is important to
mention:

Moskowitz is not aware of all the rules and procedures.
Moskowitz does not have any problem in mentioning Zigbee IP if it was
all groups.

Das requested to revise the PAR.


regards,
-Subir






On 11/12/2011 5:03 PM, James P. K. Gilb wrote:
All

I have posted the draft closing minutes to the November 2011 meeting
web page at:
http://www.ieee802.org/minutes/2011-November/index.shtml

I have also posted the three closing reports that I have received:
802.3
802.11
802.18

Please send me your closing reports.

James Gilb

----------
This email is sent from the 802 Executive Committee email reflector.
This list is maintained by Listserv.


----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.