[802SEC] VeriLAN, projectors, and interims
All-
I have an immediate issue that I would like addressed at the Monday EC
meeting. Paul has suggested I circulate a motion either for discussion at
the meeting or inclusion on the consent agenda if it is non controversial
enough.
By way of background---
We do not have a conclusion to the Verilan contract renewal at this
point. This leaves the whole issue of projectors at interims up in the
air. The way we have been operating until now is 802 has made projectors
available for use at interims at no charge as part of our current
arrangement. If that changes, then this adds a non trivial added cost
burden to the interims. I need to go live, ASAP, with the registration for
the January wireless interim but the projector status is unknown and this
will affect the fees that need to be charged. I would like to get an
extension of the current deal, at least for the upcoming January
interims. That way, regardless of what happens on the network services
contract, we are covered with a known situation. We can decide later
whether we want to make that permanent in the event it is not part of the
new agreement. My only concern for now is January.
Motion: Extend the existing arrangement for projectors at Interims to
include any interims held between the November, 2012 802 Plenary and the
March, 2012 802 Plenary.
Mover: Bob Heile
Second:
Regards
Bob
Bob Heile, Ph.D
Chairman, ZigBee Alliance
Chair, IEEE 802.15 Working Group on Wireless Personal Area Networks
Co-Chair IEEE P2030 Task Force 3 on Smartgrid Communications
11 Robert Toner Blvd
Suite 5-301
North Attleboro, MA 02763 USA
Mobile: +1-781-929-4832
email: bheile@ieee.org
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.