Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear All, In compliance with the 30 day rule for the PAR consideration at the November 2011 Plenary Meeting in Atlanta; Attached please find the pdf versions of the PAR and 5C for the P802.22b Amendment PAR: Standard for Information Technology--Telecommunications and information exchange between systems Wireless Regional Area Networks (WRAN)--Specific requirements Part 22: Cognitive Wireless RAN Medium Access Control (MAC) and Physical Layer (PHY) Specifications: Policies and Procedures for Operation in the TV Bands. Amendment: Enhanced Broadband and Monitoring This PAR is the result of the Regional Area Smart Grid and Critical Infrastructure Monitoring Study Group that was approved by the EC during the July 2011 Plenary Meeting. The Study Group activities are being chaired by Dr. Aziz Rahman from NICT. The Working Group has approved the contents of the PAR with a motion which can be found below for reference. The PAR form and 5C documents are available as contributions on the Mentor and can be found at (https://mentor.ieee.org/802.22/dcn/11/22-11-0118-01-rasg-par-for-enhanced-broadband-and-monitoring-amendment.pdf, https://mentor.ieee.org/802.22/dcn/11/22-11-0119-01-rasg-5c-for-enhanced-broadband-and-monitoring-amendment.pdf) respectively. Sincerely, Mody Apurva N. Mody, Ph. D. Chair, IEEE 802.22 Standard Working Group BAE Systems Technology Solutions 130 Daniel Webster Highway, Mail Stop 2350 Merrimack, NH 03054 Work: (603)885 2621, Mobile: (603)-809-0459 E-mail: apurva.mody@baesystems.com<mailto:apurva.mody@baesystems.com> 802.22 Working Group Motion - September Interim Meeting Okinawa Move to approve the contents of the document 22-11-118r1 (https://mentor.ieee.org/802.22/dcn/11/22-11-0118-01-rasg-par-for-enhanced-broadband-and-monitoring-amendment.pdf) as the contents for the P802.22b amendment PAR form and the contents of the document 22-11-119r1 (https://mentor.ieee.org/802.22/dcn/11/22-11-0119-01-rasg-5c-for-enhanced-broadband-and-monitoring-amendment.pdf) as 5C as approved by the RASGCIM study group and forward the same to the 802 Executive Committee before October 5th to meet the 30 day rule for consideration during the November plenary for the EC approval. Move to upload the PAR to the IEEE SA NESCOM before October 17th pending approval from the Sponsor Chair, so that it can be on the agenda for the December meeting of the NESCOM. Move: Aziz Rahman Second: Jerry Kalke Yes: 8 No: 0 Abstain: 0 Motion passes ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
PAR FORM_v2.pdf
Description: PAR FORM_v2.pdf
Attachment:
5_Criteria_v1.pdf
Description: 5_Criteria_v1.pdf