Re: [802SEC] IEEE P802.3bj draft PAR and 5 Criteria - Physical Layer specifications and Management parameters for 100 Gb/s operation over Backplanes and Copper Cables
David
I thought "bj" was on the list of proscribed suffixes...
Regards,
Tony
On 30 May 2011 20:22, "Law, David" <dlaw@hp.com> wrote:
> Dear EC members,
>
> In support of subclause 12.2 'LMSC Approval' of the LMSC Operations Manual
(30 day rule) please find below the required information in respect to the
IEEE P802.3bj Physical Layer specifications and Management parameters for
100 Gb/s operation over Backplanes and Copper Cables PAR for consideration
at the July 2011 plenary.
>
> Best regards,
> David
>
>
> IEEE P802.3bj Standard for Information technology--Telecommunications and
information exchange between systems--Local and metropolitan area
networks--Specific requirements Part 3: Carrier Sense Multiple Access with
Collision Detection (CSMA/CD) Access Method and Physical Layer
Specifications Amendment: Physical Layer specifications and Management
parameters for 100 Gb/s operation over Backplanes and Copper Cables
>
> [1] Draft PAR and 5C:
>
> Draft PAR <http://www.ieee802.org/3/100GCU/par_0511.pdf>.
> Draft 5C <http://www.ieee802.org/3/100GCU/5C_0511.pdf>.
>
> [2] Explanatory technical background material:
>
> This project is to amend IEEE Std 802.3 to specify additions to, and
appropriate modifications of, IEEE Std 802.3 to add 100 Gb/s 4 lane Physical
Layer (PHY) specifications and management parameters for operation on
backplanes and twinaxial copper cables. Rapid growth of server, network, and
internet traffic is driving the need for higher data rates over backplanes
and high density, low cost twinaxial copper cables.
>
> [3] Work plan for the development of managed object definitions:
>
> The project will include a protocol independent specification of managed
objects with SNMP management capability to be provided in the future by an
amendment to the yet-to-be-approved IEEE P802.3.1 Ethernet MIBs.
>
> [4] Status of the development of the PAR:
>
> The PAR and 5C drafts are pending IEEE 802.3 Working Group approval at the
July Plenary. Should the IEEE 802.3 Working Group not approve the
submission, it will be removed from the IEEE 802 Executive Committee agenda.
>
> ----------
> This email is sent from the 802 Executive Committee email reflector. This
list is maintained by Listserv.
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.