Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All, I've prepared 3 summary documents of substantive changes for: AudCom changes required for LMSC P&P to be approved Revision for LMSC OM Revision for LMSC WG P&P These are all short documents. Please study them and express any concerns on the reflector. I plan to have votes to approve all 3 set of changes (including additional editorials for the LMSC OM and LMSC WG P&P which are posted on the document server) on Friday at the Closing EC meeting. Note that I received word from AudCom today that they did vote the remove the sentence in the LMSC WG P&P in Clause 7.3 this is of concern. So we will not be in conflict with AudCom by making this change. Best regards, Mat Matthew Sherman, Ph.D. Engineering Fellow BAE Systems - Electronics, Intelligence & Support (EI&S) Office: +1 973.633.6344 Cell: +1 973.229.9520 email: matthew.sherman@baesystems.com<mailto:matthew.sherman@baesystems.com> ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
100711 AudCom Editorial Changes.pdf
Description: 100711 AudCom Editorial Changes.pdf
Attachment:
100711 Substantive OM Mods.pdf
Description: 100711 Substantive OM Mods.pdf
Attachment:
100711 Substantive WG P&P Mods.pdf
Description: 100711 Substantive WG P&P Mods.pdf