Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC members, At the March 2010 IEEE 802 Plenary meeting, conditional approval was granted to forward IEEE P802.3ba 40Gb/s and 100Gb/s Ethernet to RevCom. Details are provide in the attached report, but in summary the response to the IEEE 802 LMSC Operations Manual Clause 14 ‘Procedure for Conditional Approval to Forward a Draft Standard’ items are as follows: a) The recirculation balloting is complete. The second recirculation ballot and comment resolution occurred essentially in accordance of the plan presented. b) The approval rate is greater than 75% and there were no new negative DISAPPROVES votes. c) No technical changes have been made. d) There were no new valid DISAPPROVE comments. e) There were no new invalid DISAPPROVE comments. Based on the above I plan to submit the draft to RevCom for consideration at its June meeting. Best regards, David Law IEEE 802.3 Working Group Chair
Attachment:
IEEE802d3ba_clause14_report.pdf
Description: Binary data