Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Colleagues- Per the following OM requirement with respect to PAR/5 Criteria feedback: The proposing WG shall post a response to commenting WG and to the Sponsor together with a Final PAR on a public website and circulate the relevant URL on the Sponsor reflector not later than 5:00 p.m. on Wednesday of the plenary session. My response is herein: Comments were received from: * 802.11 * 802.16 * 802.19In addition, comments were received from two individuals, Bob Grow and Hugh Barass
Most of the comments that affected the submitted documents related to the "Scope" and a new scope was generated that we believe incorporates most of those comments. There were several other minor changes.
The changes are reflected in two attached documents:- Changes for the PAR (to be entered by the NECSOM Administrator after consideration by the EC)
- Changes to the 5 CriteriaThese two documents are also available on the ES-ECSG document service site as "PAR 5 Responses" The URL for that site is: https://mentor.ieee.org/802-sg-emergency-services/documents.
If there are any questions, please do not hesitate to get in touch. Best regards, Geoff Geoffrey O. Thompson Chair, 802 Emergency Services EC Study Group Member Emeritus, 802 Executive Committee GraCaSI Standards Advisory Services 158 Paseo Ct. Mountain View, CA 94043-5286 <thompson@ieee.org> +1.540.227.0059 ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
PAR 5 Responses.zip
Description: Zip archive