Re: [802SEC] +++EC 5 Day Review+++802.18 Comments on FCC Smart Grid Notice
Mike
I approve - but I would like to see "premise" changed to "premises" (multiple occurrences). The singular "premise" does not exist except for a term in logic. (See http://www.wsu.edu/~brians/errors/premise.html )
Mark
-----Original Message-----
From: ***** IEEE 802 Executive Committee List ***** [mailto:STDS-802-SEC@ieee.org] On Behalf Of MJLynch@mjlallc.com
Sent: Thursday, October 01, 2009 12:15 PM
To: STDS-802-SEC@LISTSERV.IEEE.ORG
Subject: Re: +++EC 5 Day Review+++802.18 Comments on FCC Smart Grid Notice
Dear EC,
I have received some proposed edits to this document.
All of the FCC's questions are now in Italics.
All of Roger's very useful edits have been accepted.
The majority of Geoff's comments have been accepted, and I want to thank Geoff for pointing out an issue that I had meant to correct at the bottom of page 1/top of page 2. As a result the paragraph numbering beginning on page 2 has been slightly changed.
The document is now 18-09-0105-06 and is available on 802.18's Mentor web site:
https://mentor.ieee.org/802.18/documents
Regards,
Mike
From: MJLynch@mjlallc.com
Sent: Sunday, September 27, 2009 12:47
To: 'STDS-802-SEC@LISTSERV.IEEE.ORG'
Subject: +++EC 5 Day Review+++802.18 Comments on FCC Smart Grid Notice
Dear EC,
On 4 September the FCC issued a notice calling for responses to their questions regarding the implementation of Smart Grid technology. This is related to the ongoing FCC work on the nationwide broadband proposal.. The response time was somewhat better than the previous item that 802 responded to but the timeframe was too short to allow a thorough response.
During last week's wireless interim 802.18, in conjunction with other WGs, developed a response. That document (18-09-0105-05) is available at:
https://mentor.ieee.org/802.18/documents
The FCC due date for the comments is 2 October.
Also available as 18-09-0104-00 is the FCC notice.
This document is being sent to you for the five day review process.
I am proposing that the EC review period begins now and closes on 1 October and the 802.18 response will be filed on 2 October.
Regards,
Mike
+1.972.814.4901 Mobile
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.