Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Attendees: Bruce Kraemer Mike Lynch Matthew Sherman Geoff Thompson Actions: Confirm with Buzz that a room has been reserved for the P&P meeting on the Saturday after the Plenary - Mat by 7/3/09 PDF version of latest drafting available for Sunday P&P meeting - Mat by 7/11/09 Minutes: Opened about 11 AM The group started at the beginning of the current draft of the WG P&P and reviewed through section 6. A variety of small changes and comments were made which are reflected in the attached document. Most issues were notated for further discussion at the Sunday P&P meeting. The meeting lasted about 1 hour. Mat is available by Phone and E-mail to discuss / receive comments on the existing texts. Mat plans to run the FULL four hours for the Sunday night P&P meeting. Adjourned about 12 PM. Matthew Sherman, Ph.D. First Vice Chair, IEEE 802 Engineering Fellow BAE Systems - Electronics, Intelligence, & Support (EI&S) Office: +1 973.633.6344 Cell: +1 973.229.9520 email: matthew.sherman@baesystems.com ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
090625 Draft IEEE 802 WG_PandP.doc
Description: 090625 Draft IEEE 802 WG_PandP.doc