Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] Procedure 19 report for IEEE P802.3av 10Gb/s EPON to Sponsor Ballot



Dear EC members,

At the November 2008 IEEE 802 Plenary meeting conditional approval was 
granted to forward IEEE P802.3av 10Gb/s Ethernet Passive Optical Network 
(EPON) to Sponsor Ballot. This email is to report that the conditions have 
been met. Details are provide in the attached report but in summary the 
response to the Clause 19 ‘Procedure for Conditional Approval to Forward a 
Draft Standard’ items are as follows:

a) The recirculation and resolution occurred essentially 
   in accordance of the plan presented.

b) The approval rate after resolution of the ballot is 
   greater than 75% and there were no new negative
   DISAPPROVES votes.

c) No technical changes have been made.

d) There were no new valid DISAPPROVE comments.

e) There were five new DISAPPROVE comments ruled invalid
   by the WG chair.

Based on the above I will be opening the sponsor ballot shortly.

Best regards,
David Law
IEEE 802.3 Working Group Chair



Attachment: IEEE802d3av_proc19_report.pdf
Description: Binary data