Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC members, At the November 2008 IEEE 802 Plenary meeting conditional approval was grated to forward IEEE P802.3at DTE Power via MDI to Sponsor Ballot. This email is to report that the conditions have been met. Details are provide in the attached report but in summary the response to the Clause 19 ‘Procedure for Conditional Approval to Forward a Draft Standard’ items are as follows: a) The recirculation and resolution occurred essentially in accordance of the plan presented. b) The approval rate after resolution of the ballot is greater than 75% and there were no new negative DISAPPROVES votes. c) No technical changes have being made. d) There were no new valid DISAPPROVE comments. e) There were two new DISAPPROVE comments ruled invalid by the WG chair. Based on the above I will be opening the sponsor ballot shortly. Best regards, David Law IEEE 802.3 Working Group Chair
Attachment:
IEEE802d3at_proc19_report.pdf
Description: Binary data