Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear EC colleagues, This note is to report that Clause 19 Conditions for approval to move TGn Draft 7.0 to Sponsor Ballot have been met and the draft will be prepared for release to sponsor ballot as soon as possible. In summary, The 15 day 802.11 re-circulation of TGn D7.0 was conducted as letter ballot 138 and closed on Tuesday December 02, 2008. There were zero "disapprove" votes cast in this ballot. Cumulative approval increased to 95.25% from 94.2% in the prior ballot with a net improvement of 5 additional approve votes. The tally now stands at 281/14/20 There were 9 comments received from four of the yes voters for which no changes to the draft will result. Prior to conducting LB138 there were 102 outstanding unsatisfied comments from 15 unsatisfied balloters as documented in reports 11-08-1217r2, 11-08-1417r0 and 11-08-1437r1. Of the 15 unsatisfied balloters one responded to LB138 changing from a "disapprove" to "approve" reducing the total outstanding unsatisfied comments to 100. A more complete report referencing the conditions stated in Clause 19 in the current LMSC rules and the TGn status following recirculation LB138 are contained in the attached (small) pdf file. The sponsor ballot pool formation was completed on August 30, 2008, has not expired, and does not need to be refreshed. Regards, Bruce Kraemer Chair WG11 ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Attachment:
LB138 EC report on Clause 19 Conditions.pdf
Description: LB138 EC report on Clause 19 Conditions.pdf