Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Fellow EC members, Please recall that AudCom required of IEEE802 that we remove extraneous material from our P&P to make it easier for them to review. A deadline of the end of the year was set. If we are to meet that deadline, we need to initiate our ballot process fairly soon. Accordingly, I have created a 'streamlined' P&P which closely follows AudCom's baseline P&P. I have moved any 'extraneous' material to a new document called the Operations Manual (OM). To accomplish this I did the following: Started with AudCom Baseline P&P Inserted material from our current P&P into the AudCom Baseline This became a proposed new LMSC P&P Formatted remaining material as a proposed LMSC OM Created a modified Baseline P&P with my personal comments to be fed back to AudCom These modification have been included in the proposed LMSC P&P as well. Accordingly please find the following documents attached: Draft_LMSC_PaP_080223_Clean.doc: Proposed new P&P with no markups Draft_LMSC_PaP_080223_Mark_Up.doc: Proposed new P&P in marked up form with comments Draft_LMSC_OM_080223_Clean.doc: Proposed new OM with no markups Draft_LMSC_PaP_080223_Mark_Up.doc: Proposed new OM in marked up form with comments Mats revised baseline-Sponsor-clean-7June2007 as of 080223.doc: My recommended revisions to the AudCom baseline P&P Current_LMSC_P&P_remapping_080223.doc: A mapping of all the text in the current P&P showing where it wound up Please remember that these documents are my personal opinion of what should be done (they are not consensus documents). As such they have no more standing that any other proposal from an EC member. However, in the interest of getting the process going, I do plan to request the EC to initiate a ballot at our March 08 session on this material. I had hoped to have some comment and resolution teleconferences to help develop consensus prior to the meeting. Unfortunately other work commitments prevented this. Still I will hold our normal P&P review meeting Sunday evening of our Orlando session and will bring these documents to the floor for consideration. I will also accept and tabulate any comments brought forward on these documents, and make modifications to the documents based on those comments to try to build consensus. My request of the EC is that they review these documents and provide comments in advance to me so I can tabulate and try and formulate responses. Please support me in this effort. Best Regards, Mat Matthew Sherman, Ph.D. Engineering Fellow BAE Systems - Network Systems (NS) Office: +1 973.633.6344 Cell: +1 973.229.9520 email: matthew.sherman@baesystems.com ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
Draft_LMSC_PaP_080223_Clean.doc
Draft_LMSC_PaP_080223_Mark_Up.doc
Mats revised baseline-Sponsor-clean-7June2007 as of 080223.doc
Current_LMSC_P&P_remapping_080223.doc
Draft_LMSC_OM_080223_Mark_Up.doc
Draft_LMSC_OM_080223_Clean.doc