Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All, 802.20 intends to present the two attached PARs for approval by the EC to forward to NESCOM in March. I am circulating the text of the draft PARs and their attendant five criterion under the 30-day rule. Attachment 802.20.3 contains the PAR Standard for Minimum Performance Characteristics of 802.20 Terminals and Base Stations and its five criterion. Attachment 802.20.2 is the PAR for Protocol Implementation Conformance statement (PIC) Pro-forma. The five criteria for this PAR is in the third attachment. Arnie Greenspan ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
P802[1].20.3 PAR and 5 CriteriaJU.doc
Project Authorization Request (PAR) ProcessJT.pdf
2008-02-11 802[1].20 PICS Proforma 5c-015C.ppt