Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Rona, I received some requests for additional editorial actions with the LMSC P&P. The attached document includes editorial changes in response to those requests. These include: Addition of a 'last edited' date so that editorial revisions can be tracked Restored hyperlinks that were lost in the conversion process from word to PDF I request that you post this in place of the currently posted P&P. Let me know if there are any issues with this. Thanks much! Mat Matthew Sherman, Ph.D. Engineering Fellow BAE Systems - Network Systems (NS) Office: +1 973.633.6344 Cell: +1 973.229.9520 email: matthew.sherman@baesystems.com ---------- This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.
LMSC_P&P_July_2007_approved_rev071104.pdf